Statements (17)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:color |
brown
|
| gptkbp:electrification |
750 V DC third rail
|
| gptkbp:endPoint |
Boğaziçi Üniversitesi/Hisarüstü
|
| gptkbp:length |
3.3 km
|
| gptkbp:location |
gptkb:Turkey
|
| gptkbp:name |
gptkb:M6
|
| gptkbp:numberOfStations |
4
|
| gptkbp:opened |
2015
|
| gptkbp:operatedBy |
gptkb:Metro_Istanbul
|
| gptkbp:operatesIn |
gptkb:Istanbul
|
| gptkbp:startPoint |
gptkb:Levent
|
| gptkbp:system |
gptkb:Istanbul_Metro
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:M2_Istanbul_Metro_line
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
M6 line
|