Statements (19)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:color |
red
|
| gptkbp:connects |
gptkb:Ankaray
gptkb:M2_(Ankara_Metro) gptkb:M3_(Ankara_Metro) |
| gptkbp:electrification |
750 V DC third rail
|
| gptkbp:endPoint |
gptkb:Batıkent
|
| gptkbp:location |
gptkb:Ankara,_Turkey
|
| gptkbp:numberOfStations |
12
|
| gptkbp:opened |
29 December 1997
|
| gptkbp:operator |
gptkb:EGO_(Ankara)_Transportation_Department
|
| gptkbp:partOf |
gptkb:Ankara_Metro
|
| gptkbp:serves |
central Ankara
|
| gptkbp:startPoint |
gptkb:Kızılay
|
| gptkbp:systemLength |
14.7 km
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:Ulus_Metro_Station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
M1 (Ankara Metro)
|