Properties (56)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Light rail line
|
gptkbp:annualRidership |
over 20 million
|
gptkbp:colors |
Red
|
gptkbp:communityImpact |
Improved access to public transport
|
gptkbp:connects |
Tallaght
Sandyford |
gptkbp:constructionMaterial |
2004
|
gptkbp:constructionStarted |
2001
|
gptkbp:design |
Modern tram design
|
gptkbp:electrification |
Overhead line
|
gptkbp:environmentalImpact |
Low emissions
|
gptkbp:expansion |
2010
|
gptkbp:fareSystem |
Dublin_Zone_1
|
gptkbp:funding |
Public-private partnership
|
gptkbp:futurePlans |
Further extensions planned
|
https://www.w3.org/2000/01/rdf-schema#label |
Luas Red Line
|
gptkbp:integration |
gptkb:Dublin_Bus
gptkb:Irish_Rail DART |
gptkbp:interchanges |
Tallaght
Sandyford Abbey Street The_Point Dawson_Street Jervis O'Connell/Abbey_Street |
gptkbp:keyIssues |
Ticket vending machines
CCTV surveillance Accessibility features Sheltered waiting areas Level crossings Wi-Fi availability Bicycle parking facilities Art installations at stations Real-time passenger information Dedicated tram lanes Traffic signal priority |
gptkbp:length |
13.5 km
|
gptkbp:maintenanceFee |
gptkb:Red_Cow_Depot
|
gptkbp:numberOfStations |
30
|
gptkbp:opened |
2004
|
gptkbp:operatedBy |
gptkb:Transdev_Ireland
|
gptkbp:partOf |
Luas system
|
gptkbp:passengerCapacity |
200
|
gptkbp:rollingStock |
gptkb:Bombardier_Flexity_Swift
|
gptkbp:safetyFeatures |
Automatic train protection
|
gptkbp:services |
Every 5-10 minutes
5:30 AM to 12:30 AM |
gptkbp:serviceType |
Urban transit
|
gptkbp:speed |
30 km/h
|
gptkbp:terminus |
Tallaght
The_Point |
gptkbp:ticketingSystem |
gptkb:Leap_Card
|
gptkbp:track |
1435 mm
|
gptkbp:type |
Tram
|
gptkbp:zone |
gptkb:Dublin
|