Statements (26)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:annualRidership |
~16,000 (2019)
|
| gptkbp:color |
light green
|
| gptkbp:electrification |
gptkb:third_rail
|
| gptkbp:expansion |
possible merger with Line 7bis
|
| gptkbp:hasStation |
gptkb:Pelleport
gptkb:Saint-Fargeau gptkb:Gambetta gptkb:Porte_des_Lilas |
| gptkbp:length |
1.3 km
|
| gptkbp:locatedIn |
gptkb:Paris
|
| gptkbp:mapType |
3bis
|
| gptkbp:nowPartOf |
Line 3
|
| gptkbp:numberOfStations |
4
|
| gptkbp:opened |
27 November 1921
|
| gptkbp:operatedBy |
gptkb:RATP
|
| gptkbp:partOf |
gptkb:Paris_Métro
|
| gptkbp:rollingStock |
gptkb:MF_67
|
| gptkbp:servesArea |
gptkb:20th_arrondissement_of_Paris
gptkb:19th_arrondissement_of_Paris |
| gptkbp:terminus |
gptkb:Gambetta
gptkb:Porte_des_Lilas |
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:Gambetta_(Paris_Métro)
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Line 3bis
|