Lijiang–Dali railway

GPTKB entity

Properties (52)
Predicate Object
gptkbp:instanceOf railway
gptkbp:accessibility wheelchair accessible
gptkbp:amenities Wi-Fi available
restrooms available
food services available
waiting areas provided
gptkbp:connects Lijiang_and_Dali
gptkbp:constructionMaterial local materials used
approximately 10 billion yuan
gptkbp:constructionStarted 2014
gptkbp:culturalImpact promotes local culture
supports local economy
enhances cultural exchange
gptkbp:electrification yes
gptkbp:environmentalImpact minimized through design
gptkbp:futurePlans sustainability initiatives
partnerships with local businesses
community engagement programs
expansion to other cities
enhanced safety measures
upgrades to stations
increased frequency of services
integration with other transport modes
improvements in service quality
potential high-speed extensions
collaboration with travel agencies
development of tourist packages
https://www.w3.org/2000/01/rdf-schema#label Lijiang–Dali railway
gptkbp:length approximately 160 kilometers
gptkbp:maintenance regular inspections required
gptkbp:opened 2018
gptkbp:operatesIn gptkb:Lijiang
gptkb:Dali
gptkbp:operator gptkb:China_Railway
gptkbp:partOf Yunnan_railway_network
gptkbp:passengerCapacity up to 1,000 passengers per train
gptkbp:safetyFeatures modern signaling systems
gptkbp:scenicViews gptkb:Erhai_Lake
gptkb:Dali_Lake
gptkb:Lijiang_Old_Town
Yulong Snow Mountain
gptkbp:serves gptkb:Yunnan_Province
gptkbp:significance improves regional connectivity
boosts tourism
facilitates trade
gptkbp:stations gptkb:Dali_Station
gptkb:Lijiang_Station
gptkbp:ticketingSystem digital ticketing available
gptkbp:track 1,435 mm (standard gauge)
gptkbp:transportation yes
gptkbp:travelTime about 1.5 hours
gptkbp:type high-speed railway