Lhasa–Nyingchi Railway

GPTKB entity

Statements (30)
Predicate Object
gptkbp:instanceOf gptkb:railway_line
gptkbp:constructionStartYear 2014
gptkbp:country gptkb:China
gptkbp:electrification 25 kV AC
gptkbp:endPoint gptkb:Nyingchi
https://www.w3.org/2000/01/rdf-schema#label Lhasa–Nyingchi Railway
gptkbp:length 435 km
gptkbp:locatedIn gptkb:Tibet_Autonomous_Region
gptkbp:maximumSpeed 160 km/h
gptkbp:notableEvent inaugurated on 25 June 2021
gptkbp:notableFeature first electrified railway in Tibet
crosses Yarlung Tsangpo River
includes 121 bridges
includes 47 tunnels
operates at high altitude
trains equipped with oxygen supply system
uses Fuxing EMU trains
gptkbp:opened 2021
gptkbp:operator gptkb:China_State_Railway_Group
gptkbp:partOf Sichuan–Tibet Railway
gptkbp:purpose promote economic development
enhance national integration
improve transportation in Tibet
gptkbp:startPoint gptkb:Lhasa
gptkbp:station gptkb:Lhasa
gptkb:Nyingchi
gptkb:Shannan
gptkbp:trackGauge standard gauge
gptkbp:bfsParent gptkb:China's_national_railway_network
gptkbp:bfsLayer 7