Statements (22)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connects |
gptkb:Kunming
gptkb:Dali gptkb:Lijiang |
| gptkbp:country |
gptkb:China
|
| gptkbp:electrification |
not electrified (as of opening)
|
| gptkbp:endPoint |
gptkb:Lijiang
|
| gptkbp:length |
517 km
|
| gptkbp:locatedIn |
gptkb:Yunnan_Province
|
| gptkbp:notableFeature |
includes many tunnels and bridges
passes through mountainous terrain |
| gptkbp:numberOfStations |
20+
|
| gptkbp:opened |
2009
|
| gptkbp:operator |
gptkb:China_Railway
|
| gptkbp:partOf |
Yunnan railway network
|
| gptkbp:purpose |
passenger transport
freight transport |
| gptkbp:startPoint |
gptkb:Kunming
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:Chuxiong_Railway_Station
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Kunming–Lijiang railway
|