Statements (49)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Barrage
|
gptkbp:built |
1963
|
gptkbp:commissioningDate |
1963
|
gptkbp:community_engagement |
Involvement of local communities
|
gptkbp:community_impact |
Support for local communities
|
gptkbp:construction_cost |
Estimated at ₹ 50 crores
|
gptkbp:constructionMaterial |
Earth_and_rock
|
gptkbp:country |
gptkb:India
|
gptkbp:design |
gptkb:Central_Water_Commission
Gravity dam design |
gptkbp:electronicSystems |
Civil engineering project
|
gptkbp:emergencyServices |
Flood emergency response plans
|
gptkbp:environmental_impact |
Affected by climate change
Alteration of local ecosystem |
gptkbp:future_plans |
Upgrades and improvements planned.
|
gptkbp:height |
8.5 meters
|
gptkbp:historical_significance |
Part_of_Kosi_River_management_history
|
https://www.w3.org/2000/01/rdf-schema#label |
Kosi Barrage
|
gptkbp:impact |
Flood mitigation
|
gptkbp:isBeneficialFor |
Farmers_in_Bihar
|
gptkbp:length |
2,500 meters
|
gptkbp:lighting |
1,000,000 cubic meters
High flood risk area Frequent_flooding_in_Kosi_River_basin |
gptkbp:location |
gptkb:Kosi_River
|
gptkbp:maintenance |
Regular maintenance required
|
gptkbp:nearby_attractions |
Local tourism site
|
gptkbp:nearestCity |
Supaul
Kishanganj Madhepura Purnia |
gptkbp:notableWork |
Kosi_Canal_Project
|
gptkbp:operator |
Bihar_State_Water_Resources_Department
|
gptkbp:purpose |
Flood control
Irrigation |
gptkbp:region |
Key_infrastructure_in_Bihar
|
gptkbp:research |
Studies on flood management
|
gptkbp:reservoir |
gptkb:Kosi_River
|
gptkbp:responsibleFor |
State and central government oversight
|
gptkbp:significance |
Irrigation for agriculture
|
gptkbp:spillwayType |
Gated spillway
|
gptkbp:state |
gptkb:Bihar
|
gptkbp:type |
Earthfill dam
|
gptkbp:waterManagement |
Integrated water resources management
Regular monitoring required Kosi_River_basin |
gptkbp:waterQuality |
gptkb:Kosi_River
Freshwater Irrigation and drinking water |