Konya-Kayseri high-speed railway
GPTKB entity
Statements (16)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:connects |
gptkb:Kayseri
gptkb:Konya |
| gptkbp:electrification |
25 kV AC
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:locatedIn |
gptkb:Turkey
|
| gptkbp:maximumSpeed |
250 km/h
|
| gptkbp:operator |
gptkb:TCDD_(Turkish_State_Railways)
|
| gptkbp:partOf |
gptkb:Turkish_high-speed_rail_network
|
| gptkbp:plannedOpening |
2026
|
| gptkbp:purpose |
passenger transport
freight transport |
| gptkbp:status |
under construction
|
| gptkbp:bfsParent |
gptkb:Nevşehir_Station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Konya-Kayseri high-speed railway
|