Statements (48)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway station
|
gptkbp:accessibility |
Disabled-friendly stations
|
gptkbp:annualRidership |
approximately 50,000
|
gptkbp:averageTemperature |
25.6 km
|
gptkbp:communityFeedback |
Positive public response
|
gptkbp:communityImpact |
Job creation
|
gptkbp:constructionMaterial |
Steel and concrete
₹5,181 crore |
gptkbp:constructionStarted |
2013
|
gptkbp:controls |
Centralized control system
|
gptkbp:culturalSignificance |
Promotes_urban_development
|
gptkbp:design |
Modern architectural design
|
gptkbp:drivetrain |
Aluva to Palarivattom
|
gptkbp:electrification |
1500 V DC
|
gptkbp:emergencyServices |
Fire safety measures
|
gptkbp:environmentalImpact |
Reduced traffic congestion
Lower carbon emissions |
gptkbp:funding |
Public-private partnership
|
gptkbp:futurePlans |
Phase 2
Integrated transport system Expansion to nearby districts |
gptkbp:governance |
Government of Kerala
|
https://www.w3.org/2000/01/rdf-schema#label |
Kochi Metro
|
gptkbp:integration |
gptkb:Kochi_Water_Metro
|
gptkbp:length |
25.6 km
|
gptkbp:localEconomy |
Boosts local businesses
|
gptkbp:location |
gptkb:Kochi,_India
|
gptkbp:maintenance |
Automated systems
|
gptkbp:numberOfStations |
22
|
gptkbp:opened |
2017
|
gptkbp:operator |
gptkb:Kochi_Metro_Rail_Limited
|
gptkbp:partnerships |
Local government
International collaborations |
gptkbp:passengerCapacity |
200,000 passengers per day
|
gptkbp:productLine |
Aluva_to_Petta
|
gptkbp:project |
4 years
|
gptkbp:publicAccess |
Awareness campaigns
|
gptkbp:safetyFeatures |
CCTV surveillance
|
gptkbp:serviceType |
Urban transit
|
gptkbp:significance |
First metro rail project in Kerala
|
gptkbp:speed |
80 km/h
|
gptkbp:sustainability |
Eco-friendly initiatives
|
gptkbp:technology |
Smart technologies
Modern metro technology |
gptkbp:ticketingSystem |
Smart card system
|
gptkbp:training |
Every 10 minutes
3-car trains |
gptkbp:type |
Rapid transit
|