Statements (21)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam
|
| gptkbp:annualGeneration |
652 GWh
|
| gptkbp:basinSize |
gptkb:Euphrates_Basin
|
| gptkbp:capacity |
189 MW
|
| gptkbp:constructionStartYear |
1996
|
| gptkbp:crosses |
gptkb:Euphrates_River
|
| gptkbp:height |
21.2 m
|
| gptkbp:length |
445 m
|
| gptkbp:locatedIn |
gptkb:Turkey
gptkb:Gaziantep_Province |
| gptkbp:opened |
2000
|
| gptkbp:owner |
gptkb:State_Hydraulic_Works_(DSI)
|
| gptkbp:partOf |
gptkb:Southeastern_Anatolia_Project
|
| gptkbp:purpose |
Hydroelectric power generation
Irrigation |
| gptkbp:reservoirCapacity |
157,000,000 m³
|
| gptkbp:status |
Operational
|
| gptkbp:type |
Embankment dam
|
| gptkbp:bfsParent |
gptkb:Southeastern_Anatolia_Project_(GAP)
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Karkamis Dam
|