Statements (52)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway line
|
gptkbp:benefits |
commuters
|
gptkbp:built |
2018
|
gptkbp:communityImpact |
increased property values
improved access to jobs enhanced local economy better connectivity reduced travel stress |
gptkbp:connects |
gptkb:Kalyan_Junction
Bhiwandi |
gptkbp:constructionStarted |
2014
|
gptkbp:electrification |
yes
|
gptkbp:environmentalImpact |
lower carbon emissions
reduced pollution promotes public transport less traffic congestion conservation of fuel |
gptkbp:facilities |
food stalls
restrooms ticket counters waiting areas parking areas |
gptkbp:frequency |
high frequency trains
|
gptkbp:funding |
gptkb:Indian_Government
|
gptkbp:futurePlans |
sustainable urban development
integrated transport system enhanced rail infrastructure reduced urban sprawl smart_city_initiatives Bhiwandi_to_Kasara extension_to_Thane |
https://www.w3.org/2000/01/rdf-schema#label |
Kalyan–Bhiwandi line
|
gptkbp:improves |
local transport
|
gptkbp:length |
approximately 20 km
|
gptkbp:opened |
2018
|
gptkbp:operatedBy |
gptkb:Central_Railway
|
gptkbp:operationalStatus |
operational
|
gptkbp:partOf |
gptkb:Mumbai_Suburban_Railway_Network
|
gptkbp:passengerCapacity |
high capacity trains
|
gptkbp:project |
estimated at ₹500 crore
|
gptkbp:providesAccessTo |
Bhiwandi Industrial Area
|
gptkbp:reduces |
on roads
|
gptkbp:safetyFeatures |
CCTV surveillance
|
gptkbp:serves |
gptkb:Mumbai_Metropolitan_Region
|
gptkbp:serviceType |
passenger trains
|
gptkbp:stations |
gptkb:Kalyan_Junction
Bhiwandi_Road Kalyan_Bhiwandi |
gptkbp:ticketingSystem |
smart card system
|
gptkbp:track |
gptkb:Central_Railway_Zone
|
gptkbp:travelTime |
between_Kalyan_and_Bhiwandi
|
gptkbp:type |
suburban railway
|