Jurong Region Line (under construction)
GPTKB entity
Statements (27)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_line
|
gptkbp:announced |
2013
|
gptkbp:connectsTo |
gptkb:East_West_Line
gptkb:North_South_Line |
gptkbp:depot |
gptkb:Tengah_Depot
|
gptkbp:electrification |
750 V DC third rail
|
gptkbp:firstPhaseOpening |
2027
|
https://www.w3.org/2000/01/rdf-schema#label |
Jurong Region Line (under construction)
|
gptkbp:length |
24 km
|
gptkbp:locatedIn |
gptkb:Singapore
|
gptkbp:numberOfStations |
24
|
gptkbp:operatedBy |
gptkb:Land_Transport_Authority
|
gptkbp:owner |
gptkb:Land_Transport_Authority
|
gptkbp:plannedOpening |
2027
|
gptkbp:rollingStock |
Alstom Metropolis C751J
|
gptkbp:secondPhaseOpening |
2028
|
gptkbp:servesArea |
gptkb:Jurong_East
gptkb:Jurong_West gptkb:Choa_Chu_Kang gptkb:Tengah |
gptkbp:status |
under construction
|
gptkbp:system |
gptkb:Singapore_MRT
|
gptkbp:thirdPhaseOpening |
2029
|
gptkbp:trackGauge |
standard gauge
|
gptkbp:type |
rapid transit
|
gptkbp:bfsParent |
gptkb:South-West_Singapore
|
gptkbp:bfsLayer |
7
|