Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connects |
gptkb:Yeongcheon_Station
Dodam Station |
| gptkbp:electrification |
electrified
|
| gptkbp:length |
approximately 93.1 km
|
| gptkbp:locatedIn |
gptkb:South_Korea
|
| gptkbp:opened |
2021
|
| gptkbp:operatedBy |
gptkb:Korea_Railroad_Corporation
|
| gptkbp:purpose |
passenger transport
freight transport |
| gptkbp:regionServed |
gptkb:North_Gyeongsang_Province
gptkb:North_Chungcheong_Province |
| gptkbp:status |
operating
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:type |
heavy rail
|
| gptkbp:bfsParent |
gptkb:Chungju_Station
|
| gptkbp:bfsLayer |
8
|
| http://www.w3.org/2000/01/rdf-schema#label |
Jungbunaeryuk Line
|