Statements (24)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:metro_rail_project_phase
|
| gptkbp:country |
gptkb:India
|
| gptkbp:electrification |
750 V DC third rail
|
| gptkbp:endPoint |
gptkb:Chandpole
|
| gptkbp:extendsTo |
Phase 1B
|
| gptkbp:length |
9.63 km
|
| gptkbp:location |
Jaipur
|
| gptkbp:numberOfStations |
9
|
| gptkbp:opened |
3 June 2015
|
| gptkbp:operator |
gptkb:Jaipur_Metro_Rail_Corporation
|
| gptkbp:partOf |
gptkb:Jaipur_Metro
|
| gptkbp:period |
Phase 1A
|
| gptkbp:phase1BEndStation |
gptkb:Badi_Chaupar
|
| gptkbp:phase1BLength |
2.349 km
|
| gptkbp:phase1BNumberOfStations |
2
|
| gptkbp:phase1BOpeningDate |
23 September 2020
|
| gptkbp:phase1BStartStation |
gptkb:Chandpole
|
| gptkbp:railwayLine |
gptkb:Pink_Line
|
| gptkbp:startPoint |
gptkb:Mansarovar
|
| gptkbp:status |
operational
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:Jaipur_Metro_Rail_Corporation_Limited
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Jaipur Metro Phase 1
|