Statements (21)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:annualRidership |
over 500,000
|
| gptkbp:character |
underground
|
| gptkbp:color |
pink
|
| gptkbp:electrification |
1,500 V DC overhead line
|
| gptkbp:endPoint |
gptkb:Tavşantepe
|
| gptkbp:extension_under_construction |
gptkb:Sabiha_Gökçen_Airport
|
| gptkbp:length |
33.5 km
|
| gptkbp:location |
gptkb:Istanbul,_Turkey
|
| gptkbp:mapType |
gptkb:M4
|
| gptkbp:numberOfStations |
23
|
| gptkbp:opened |
17 August 2012
|
| gptkbp:operator |
gptkb:Metro_Istanbul
|
| gptkbp:rollingStock |
gptkb:CAF_trains
|
| gptkbp:serves |
gptkb:Asian_side_of_Istanbul
|
| gptkbp:startPoint |
gptkb:Kadıköy
|
| gptkbp:system |
gptkb:Istanbul_Metro
|
| gptkbp:trackGauge |
1435 mm
|
| gptkbp:bfsParent |
gptkb:Istanbul_Tram_T1
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Istanbul Metro M4
|