Statements (19)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_station
|
gptkbp:country |
gptkb:India
|
gptkbp:electrification |
750 V DC third rail
|
gptkbp:firstTrialRun |
September 2023
|
https://www.w3.org/2000/01/rdf-schema#label |
Indore Metro
|
gptkbp:line |
1 (under construction)
|
gptkbp:location |
gptkb:Indore
|
gptkbp:numberOfStations |
30 (planned, Phase 1)
|
gptkbp:operator |
gptkb:Madhya_Pradesh_Metro_Rail_Corporation_Limited
|
gptkbp:owner |
gptkb:Madhya_Pradesh_Metro_Rail_Corporation_Limited
|
gptkbp:plannedOpening |
2024
|
gptkbp:projectCost |
INR 7,500 crore (approx, Phase 1)
|
gptkbp:state |
gptkb:Madhya_Pradesh
|
gptkbp:status |
under construction
|
gptkbp:systemLength |
31.5 km (Phase 1)
|
gptkbp:trackGauge |
standard gauge
|
gptkbp:website |
https://mpmetrorail.com/indore-metro/
|
gptkbp:bfsParent |
gptkb:Metro_Rail
|
gptkbp:bfsLayer |
5
|