Statements (24)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:fusion
|
gptkbp:capacity |
3.2 GW
|
gptkbp:design |
gptkb:Bouygues_Construction
EPR (European Pressurized Reactor) |
gptkbp:development |
up to 25,000 jobs during construction
|
gptkbp:electrification |
low-carbon electricity
|
gptkbp:environmental_impact |
assessed
|
gptkbp:first_concrete_poured |
gptkb:2018
|
https://www.w3.org/2000/01/rdf-schema#label |
Hinkley Point C
|
gptkbp:investment |
£22-23 billion
|
gptkbp:local_government |
gptkb:British_government
|
gptkbp:location |
gptkb:Somerset,_England
|
gptkbp:operator |
gptkb:EDF_Energy
|
gptkbp:payment_methods |
contract for difference (Cf D)
|
gptkbp:power_supply |
6 million homes
|
gptkbp:project |
gptkb:Hinkley_Point_A
gptkb:Hinkley_Point_B |
gptkbp:safety_features |
advanced safety systems
|
gptkbp:status |
under construction
|
gptkbp:turbine_type |
2
|
gptkbp:type |
pressurized water reactor
|
gptkbp:year |
2026
|
gptkbp:bfsParent |
gptkb:GE_Power_&_Water
|
gptkbp:bfsLayer |
4
|