Statements (26)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connects |
gptkb:Yeongdong_Line
gptkb:Jungang_Line |
| gptkbp:electrification |
25 kV AC, 60 Hz overhead line
|
| gptkbp:endPoint |
gptkb:Gangneung_Station
|
| gptkbp:length |
120.7 km
|
| gptkbp:location |
gptkb:South_Korea
|
| gptkbp:numberOfStations |
8
|
| gptkbp:opened |
2017
|
| gptkbp:operator |
gptkb:Korail
|
| gptkbp:partOf |
South Korean high-speed rail network
|
| gptkbp:purpose |
connects Seoul metropolitan area to Gangneung
|
| gptkbp:region |
gptkb:South_Korea
gptkb:Gangwon_Province |
| gptkbp:servedEvent |
gptkb:2018_Winter_Olympics
|
| gptkbp:startPoint |
gptkb:Seowonju_Station
|
| gptkbp:status |
operational
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:usedFor |
passenger transport
freight transport |
| gptkbp:bfsParent |
gptkb:Gangneung,_Gangwon_Province
gptkb:Gangneung_Station gptkb:Seowonju_Station gptkb:Gangneung_Line_extension |
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Gangneung Line
|