Statements (29)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_line
|
gptkbp:announced |
2014
|
gptkbp:builtBy |
Salini Impregilo – NRW Joint Venture
|
gptkbp:connects |
gptkb:Midland_line
gptkb:Perth_Airport gptkb:Forrestfield |
gptkbp:electrification |
25 kV AC overhead
|
gptkbp:endPoint |
gptkb:High_Wycombe
|
gptkbp:formerName |
Forrestfield Line
|
https://www.w3.org/2000/01/rdf-schema#label |
Forrestfield–Airport Link
|
gptkbp:length |
8.5 km
|
gptkbp:location |
gptkb:Perth,_Western_Australia
|
gptkbp:numberOfStations |
3
|
gptkbp:opened |
9 October 2022
|
gptkbp:operator |
gptkb:Transperth
|
gptkbp:owner |
gptkb:Public_Transport_Authority
|
gptkbp:partOf |
gptkb:Transperth_network
|
gptkbp:projectCost |
A$1.86 billion
|
gptkbp:purpose |
connect eastern suburbs and airport to Perth CBD
|
gptkbp:serves |
gptkb:Perth_Airport
|
gptkbp:startPoint |
gptkb:Bayswater
|
gptkbp:station |
gptkb:High_Wycombe
gptkb:Airport_Central Redcliffe |
gptkbp:trackGauge |
1,067 mm
|
gptkbp:tunnel |
8 km
|
gptkbp:type |
commuter rail
|
gptkbp:bfsParent |
gptkb:Airport_Line_(Perth)
|
gptkbp:bfsLayer |
7
|