Enguri Hydroelectric Power Station
GPTKB entity
Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:capacity |
1,300 MW
|
| gptkbp:commissioned |
1978
|
| gptkbp:connectedTo |
gptkb:Vardnili_Hydroelectric_Power_Plants_Cascade
|
| gptkbp:constructionStartYear |
1961
|
| gptkbp:coordinates |
42.735°N 42.027°E
|
| gptkbp:dam |
gptkb:dam
750 meters 271.5 meters |
| gptkbp:damVolume |
3,800,000 m³
|
| gptkbp:locatedIn |
gptkb:Georgia
|
| gptkbp:locatedOnRiver |
gptkb:Enguri_River
|
| gptkbp:mainDamLocation |
near Jvari, Georgia
|
| gptkbp:notableFor |
one of the highest arch dams in the world
|
| gptkbp:operatedBy |
gptkb:Engurhesi_Ltd.
|
| gptkbp:ownedBy |
gptkb:Government_of_Georgia
|
| gptkbp:powerhouseLocation |
near Anaklia, Georgia
|
| gptkbp:reservoirCapacity |
1.1 km³
|
| gptkbp:reservoirName |
13.5 km²
|
| gptkbp:status |
operational
|
| gptkbp:suppliesElectricityTo |
gptkb:Georgia
gptkb:Abkhazia |
| gptkbp:turbineCount |
5
|
| gptkbp:turbineType |
gptkb:Francis
|
| gptkbp:bfsParent |
gptkb:Inguri_River
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Enguri Hydroelectric Power Station
|