Statements (24)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam
|
| gptkbp:capacity |
1,300 MW
|
| gptkbp:constructionStartYear |
1961
|
| gptkbp:hasTower |
5
|
| gptkbp:height |
271.5 meters
|
| gptkbp:length |
750 meters
|
| gptkbp:locatedIn |
gptkb:Georgia
|
| gptkbp:locatedOnRiver |
gptkb:Enguri_River
|
| gptkbp:opened |
1978
|
| gptkbp:operator |
gptkb:Engurhesi_Ltd.
|
| gptkbp:owner |
gptkb:Government_of_Georgia
|
| gptkbp:purpose |
hydroelectric power generation
|
| gptkbp:reservoirCapacity |
1.1 cubic kilometers
|
| gptkbp:reservoirName |
gptkb:Enguri_Reservoir
|
| gptkbp:significance |
tallest arch dam in the former Soviet Union
|
| gptkbp:status |
operational
|
| gptkbp:suppliesElectricityTo |
gptkb:Abkhazia
rest of Georgia |
| gptkbp:turbineType |
Francis-type
|
| gptkbp:UNESCO_tentative_list |
2020
|
| gptkbp:bfsParent |
gptkb:Samegrelo-Zemo_Svaneti
gptkb:Inguri_River |
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Enguri Dam
|