gptkbp:instance_of
|
gptkb:dam
|
gptkbp:capacity
|
1,650 MW
|
gptkbp:challenges
|
geological instability
|
gptkbp:climate_adaptation
|
strategies in place
|
gptkbp:climate_impact
|
local climate changes
local climate modification
|
gptkbp:community_engagement
|
involves local stakeholders
in project planning
|
gptkbp:community_impact
|
displacement of local communities
|
gptkbp:community_involvement
|
designed for climate variability
|
gptkbp:constructed_in
|
gptkb:1979
gptkb:Iberdrola
|
gptkbp:construction_cost
|
$1 billion
approximately $300 million
|
gptkbp:construction_material
|
rock and earth
|
gptkbp:construction_method
|
earth and rock fill
earthfill dam construction
|
gptkbp:construction_started
|
gptkb:1976
gptkb:1981
2 years
5 years
|
gptkbp:country
|
gptkb:Argentina
|
gptkbp:cultural_impact
|
influences local culture and economy
|
gptkbp:cultural_significance
|
to local communities
|
gptkbp:dam_type
|
embankment dam
|
gptkbp:educational_programs
|
for local communities
|
gptkbp:electrification
|
turbine generators
|
gptkbp:emergency_services
|
yes
conducted regularly
|
gptkbp:emissions_standard
|
contributes to lower emissions
|
gptkbp:environmental_concerns
|
part of national energy strategy
|
gptkbp:environmental_impact
|
altered local ecosystems
alteration of local ecosystems
|
gptkbp:fish_species
|
gptkb:trout
gptkb:salmon
|
gptkbp:fishing_regulations
|
yes
|
gptkbp:flood_control
|
yes
1,500 km²
managed
|
gptkbp:funding
|
public and private investment
|
gptkbp:height
|
145 meters
|
gptkbp:historical_significance
|
stimulated local economy
part of Argentina's energy strategy
|
https://www.w3.org/2000/01/rdf-schema#label
|
El Chocón Dam
|
gptkbp:hydrology
|
conducted prior to construction
regulated river flow
|
gptkbp:impact
|
flood control
|
gptkbp:is_a_foundation_for
|
granite and schist
granite and gneiss
|
gptkbp:last_eruption
|
yes
moderate risk
|
gptkbp:length
|
1,800 meters
|
gptkbp:location
|
gptkb:Argentina
|
gptkbp:maintenance
|
regular inspections
|
gptkbp:neighboring_city
|
gptkb:Neuquén_City
|
gptkbp:occurs_annually
|
5,000 GWh
|
gptkbp:operator
|
gptkb:Energía_Eléctrica_Argentina_S._A.
gptkb:Energía_del_Sur_S._A.
|
gptkbp:owner
|
gptkb:Argentine_government
|
gptkbp:partnerships
|
with environmental organizations
|
gptkbp:power_output
|
peak during dry seasons
|
gptkbp:power_source
|
to neighboring countries
|
gptkbp:power_supply
|
gptkb:National_Grid
to the national grid
|
gptkbp:primary_use
|
gptkb:hydroelectric_power_generation
|
gptkbp:project
|
gptkb:Piedra_del_Águila_Dam
|
gptkbp:recreation
|
boating
|
gptkbp:region
|
gptkb:Neuquén_Province
gptkb:Patagonia
|
gptkbp:regulatory_body
|
gptkb:Argentine_Energy_Regulatory_Authority
|
gptkbp:regulatory_compliance
|
governed by national laws
|
gptkbp:research
|
conducted on environmental effects
conducted on environmental impact.
|
gptkbp:reservoir
|
gptkb:El_Chocón_Reservoir
|
gptkbp:river
|
gptkb:Limay_River
|
gptkbp:safety_features
|
spillway and gates
|
gptkbp:safety_measures
|
installed monitoring systems
|
gptkbp:significance
|
largest dam in Argentina
|
gptkbp:spillway_type
|
10,000 m³/s
designed for extreme events
|
gptkbp:sustainability_practices
|
implemented in operations
adopted in operations
|
gptkbp:tourism
|
fishing and recreation
|
gptkbp:tourist_attraction
|
yes
|
gptkbp:type
|
rock-fill dam
|
gptkbp:water_management
|
145 meters
controlled
continuous monitoring system
integrated water resource management.
|
gptkbp:water_quality
|
monitored regularly
implemented
|
gptkbp:water_requirement
|
for irrigation and consumption
|
gptkbp:water_source
|
for irrigation
|
gptkbp:wildlife
|
habitat for various species
affected
|
gptkbp:year
|
gptkb:1981
|
gptkbp:bfsParent
|
gptkb:Neuquén_River
gptkb:Río_Limay
|
gptkbp:bfsLayer
|
6
|