Statements (20)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam
|
| gptkbp:annualGeneration |
298 GWh
|
| gptkbp:capacity |
110 MW
|
| gptkbp:constructionStartYear |
1986
|
| gptkbp:country |
gptkb:Turkey
|
| gptkbp:crosses |
gptkb:Tigris_River
|
| gptkbp:height |
75 m
|
| gptkbp:length |
307 m
|
| gptkbp:locatedIn |
gptkb:Turkey
gptkb:Diyarbakır_Province |
| gptkbp:opened |
1997
|
| gptkbp:operator |
gptkb:State_Hydraulic_Works_(DSİ)
|
| gptkbp:partOf |
gptkb:Southeastern_Anatolia_Project
|
| gptkbp:purpose |
irrigation
hydroelectric power generation |
| gptkbp:reservoirCapacity |
595,000,000 m³
|
| gptkbp:type |
embankment dam
|
| gptkbp:bfsParent |
gptkb:Upper_Tigris_River_Basin
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Dicle Dam
|