Dhaulasidh Hydroelectric Project
GPTKB entity
Properties (50)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:benefits |
renewable energy
reduced carbon emissions local employment increased energy security |
gptkbp:built |
2015
environmental assessments conventional funding issues community opposition technical difficulties |
gptkbp:capacity |
66 MW
|
gptkbp:commissioned |
2022
|
gptkbp:community_involvement |
infrastructure development
education initiatives social programs local stakeholders healthcare_services |
gptkbp:construction_cost |
₹ 600 crores
|
gptkbp:drainageBasin |
regulated
|
gptkbp:electrification |
hydropower technology
|
gptkbp:engineType |
3
|
gptkbp:environmental_impact |
positive
minimal |
gptkbp:funding |
economic growth
job creation energy independence energy diversification government and private investment reduced reliance on fossil fuels |
gptkbp:future_plans |
operational
7 years |
gptkbp:gridConnection |
gptkb:Himachal_Pradesh_State_Electricity_Board
|
gptkbp:height |
150 meters
45 meters |
https://www.w3.org/2000/01/rdf-schema#label |
Dhaulasidh Hydroelectric Project
|
gptkbp:location |
Himachal_Pradesh,_India
|
gptkbp:operational_status |
66 MW
|
gptkbp:operator |
gptkb:Himachal_Pradesh_Power_Corporation_Limited
|
gptkbp:powerOutput |
renewable energy
|
gptkbp:productionYears |
approximately 300 GWh
|
gptkbp:project |
gptkb:Himachal_Pradesh_Power_Corporation_Limited
modern engineering renewable energy project |
gptkbp:regulatoryCompliance |
obtained
|
gptkbp:reservoir |
1.5 million cubic meters
|
gptkbp:river |
Beas River
|
gptkbp:sustainability |
high
|
gptkbp:type |
run-of-the-river
|
gptkbp:waterQuality |
Beas River
|