Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:metro_rail_line
|
| gptkbp:annualRidership |
over 200,000 (2023)
|
| gptkbp:color |
green
|
| gptkbp:constructionStartYear |
2016
|
| gptkbp:country |
gptkb:Bangladesh
|
| gptkbp:electrification |
1,500 V DC overhead catenary
|
| gptkbp:endPoint |
gptkb:Motijheel
|
| gptkbp:length |
20.1 km
|
| gptkbp:locatedIn |
gptkb:Dhaka
|
| gptkbp:numberOfStations |
16
|
| gptkbp:opened |
2022
|
| gptkbp:operator |
gptkb:Dhaka_Mass_Transit_Company_Limited
|
| gptkbp:owner |
gptkb:Government_of_Bangladesh
|
| gptkbp:projectCost |
approximately US$2.8 billion
|
| gptkbp:purpose |
urban mass transit
|
| gptkbp:rollingStock |
gptkb:Kawasaki–Mitsubishi_Electric_trains
|
| gptkbp:startPoint |
gptkb:Uttara_North
|
| gptkbp:system |
gptkb:Dhaka_Metro_Rail
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:type |
rapid transit
|
| gptkbp:bfsParent |
gptkb:Kazipara_Metro_Station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Dhaka Metro Rail MRT Line 6
|