Properties (49)
Predicate | Object |
---|---|
gptkbp:instanceOf |
metro line
|
gptkbp:accessibility |
wheelchair accessible
|
gptkbp:annualRidership |
over 300,000 daily
|
gptkbp:colors |
red
|
gptkbp:communityImpact |
increased property values
improved access to jobs enhanced public transport options |
gptkbp:connects |
gptkb:Tianfu_Square
gptkb:North_Railway_Station |
gptkbp:electrification |
1500 V DC
|
gptkbp:environmentalImpact |
reduced traffic congestion
lower emissions |
gptkbp:fareSystem |
distance-based fare
|
gptkbp:firstAwarded |
proposed
planned completed in 2010 |
gptkbp:futurePlans |
integration with bus services
introduction of new rolling stock expansion to surrounding suburbs Line 1 extension to the north Line 1 extension to the south implementation of real-time tracking upgrading of existing stations |
https://www.w3.org/2000/01/rdf-schema#label |
Chengdu Metro Line 1
|
gptkbp:interchanges |
Line 2
Line 10 Line 4 Line 7 |
gptkbp:length |
16 kilometers
|
gptkbp:maintenance |
nightly inspections
|
gptkbp:numberOfStations |
13
|
gptkbp:openedIn |
September 27, 2010
|
gptkbp:operatedBy |
gptkb:Chengdu_Metro
|
gptkbp:safetyFeatures |
CCTV surveillance
emergency exits automatic train control fire alarms |
gptkbp:serves |
gptkb:Chengdu
|
gptkbp:services |
5-10 minutes
|
gptkbp:speed |
40 km/h
|
gptkbp:stations |
gptkb:Wuhouci
gptkb:Tianfu_Square gptkb:North_Railway_Station People's Park Chunxi Road |
gptkbp:structureType |
cut-and-cover
|
gptkbp:ticketingSystem |
contactless smart cards
|
gptkbp:travelTime |
30 minutes
|
gptkbp:type |
heavy rail
|