Changde–Yiyang–Changsha high-speed railway
GPTKB entity
Statements (26)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:connects |
gptkb:Yiyang
gptkb:Changsha gptkb:Changde |
| gptkbp:constructionStartYear |
2016
|
| gptkbp:country |
gptkb:China
|
| gptkbp:electrification |
25 kV AC
|
| gptkbp:endPoint |
Changsha West railway station
|
| gptkbp:length |
157 km
|
| gptkbp:locatedIn |
gptkb:Hunan_Province
|
| gptkbp:numberOfStations |
7
|
| gptkbp:opened |
September 6, 2022
|
| gptkbp:operator |
gptkb:China_Railway_Guangzhou_Group
|
| gptkbp:partOf |
Hohhot–Nanning high-speed railway
|
| gptkbp:startPoint |
Changde railway station
|
| gptkbp:station |
Changde railway station
Changsha West railway station Yiyang South railway station |
| gptkbp:status |
operational
|
| gptkbp:trackGauge |
1435 mm
|
| gptkbp:设计时速 |
350 km/h
|
| gptkbp:bfsParent |
gptkb:Changde_North_Railway_Station
gptkb:Changde_Railway_Station gptkb:Changde_South_Railway_Station |
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Changde–Yiyang–Changsha high-speed railway
|