Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:color |
pink
|
| gptkbp:connects |
northern and southern Brussels
|
| gptkbp:electrification |
600 V DC overhead line
|
| gptkbp:endPoint |
Stalle (P)
|
| gptkbp:hasTunnel |
North–South Axis
|
| gptkbp:locatedIn |
gptkb:Brussels
|
| gptkbp:opened |
2007
|
| gptkbp:operatedBy |
gptkb:STIB/MIVB
|
| gptkbp:partOf |
Brussels tram network
|
| gptkbp:rollingStock |
gptkb:Bombardier_Flexity_Outlook
|
| gptkbp:routeNumber |
4
|
| gptkbp:servesStation |
gptkb:Gare_du_Nord
gptkb:Albert gptkb:De_Brouckère gptkb:Rogier gptkb:Bourse gptkb:Anneessens gptkb:Gare_du_Midi gptkb:Lemonnier Stalle (P) |
| gptkbp:startPoint |
gptkb:Gare_du_Nord
|
| gptkbp:trackGauge |
1435 mm
|
| gptkbp:type |
Pre-metro/tram line
|
| gptkbp:bfsParent |
gptkb:De_Brouckère_metro_station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Brussels Metro Line 4
|