Bipole III transmission line
GPTKB entity
Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
electric power transmission line
|
gptkbp:capacity |
2,000 MW
|
gptkbp:commissioned |
2018
|
gptkbp:constructionStartYear |
2012
|
gptkbp:country |
gptkb:Canada
|
gptkbp:endPoint |
gptkb:Riel_Converter_Station
|
https://www.w3.org/2000/01/rdf-schema#label |
Bipole III transmission line
|
gptkbp:length |
1,384 km
|
gptkbp:location |
gptkb:Manitoba,_Canada
|
gptkbp:operatingSystem |
±500 kV
|
gptkbp:owner |
gptkb:Manitoba_Hydro
|
gptkbp:parallelTo |
gptkb:Bipole_II_transmission_line
gptkb:Bipole_I_transmission_line |
gptkbp:purpose |
transmit hydroelectric power from northern Manitoba to southern Manitoba
|
gptkbp:route |
gptkb:western_Manitoba
|
gptkbp:startPoint |
gptkb:Keewatinohk_Converter_Station
|
gptkbp:status |
in service
|
gptkbp:type |
gptkb:HVDC
|
gptkbp:bfsParent |
gptkb:Manitoba_Hydro
|
gptkbp:bfsLayer |
6
|