Statements (20)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:country |
gptkb:India
|
| gptkbp:electrification |
750 V DC third rail
|
| gptkbp:firstPhaseExpectedOpening |
2024
|
| gptkbp:firstPhaseLength |
14.99 km
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:line |
2 (planned)
|
| gptkbp:location |
gptkb:Bhopal
|
| gptkbp:nickname |
gptkb:Bhoj_Metro
|
| gptkbp:operator |
gptkb:Madhya_Pradesh_Metro_Rail_Corporation_Limited
|
| gptkbp:owner |
gptkb:Madhya_Pradesh_Metro_Rail_Corporation_Limited
|
| gptkbp:plannedOpening |
2024
|
| gptkbp:projectCost |
INR 6941 crore
|
| gptkbp:state |
gptkb:Madhya_Pradesh
|
| gptkbp:status |
under construction
|
| gptkbp:systemLength |
31 km (planned)
|
| gptkbp:website |
https://mpmetrorail.com/
|
| gptkbp:bfsParent |
gptkb:Metro_Rail
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Bhopal Metro
|