Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_station
|
gptkbp:country |
gptkb:Vietnam
|
gptkbp:electrification |
overhead catenary
|
gptkbp:endPoint |
gptkb:Tham_Luong
|
https://www.w3.org/2000/01/rdf-schema#label |
Ben Thanh – Tham Luong
|
gptkbp:length |
11.3 km
|
gptkbp:line |
Line 2
|
gptkbp:locatedIn |
gptkb:Ho_Chi_Minh_City
|
gptkbp:numberOfStations |
11
|
gptkbp:operator |
gptkb:Ho_Chi_Minh_City_Urban_Railway_Management_Board
|
gptkbp:owner |
gptkb:Ho_Chi_Minh_City_People's_Committee
|
gptkbp:partOf |
gptkb:Ho_Chi_Minh_City_Metro
|
gptkbp:plannedOpening |
2026
|
gptkbp:startPoint |
gptkb:Ben_Thanh
|
gptkbp:status |
under construction
|
gptkbp:trackGauge |
standard gauge
|
gptkbp:type |
rapid transit
|
gptkbp:bfsParent |
gptkb:Ho_Chi_Minh_City_Metro_(planned)
gptkb:Ho_Chi_Minh_City_Metro |
gptkbp:bfsLayer |
6
|