Beijing–Lanzhou high-speed railway
GPTKB entity
Statements (26)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:constructionStartYear |
2014
|
| gptkbp:country |
gptkb:China
|
| gptkbp:electrification |
25 kV AC
|
| gptkbp:endPoint |
gptkb:Lanzhou
|
| gptkbp:length |
approximately 1,400 km
|
| gptkbp:majorCity |
gptkb:Beijing
gptkb:Hohhot gptkb:Lanzhou gptkb:Yinchuan |
| gptkbp:maximumSpeed |
350 km/h
|
| gptkbp:operator |
gptkb:China_Railway
|
| gptkbp:part_of |
gptkb:China_High-Speed_Rail_Network
|
| gptkbp:purpose |
economic development
passenger transport |
| gptkbp:regionServed |
gptkb:North_China
gptkb:Northwest_China |
| gptkbp:sections_opened |
Beijing–Zhangjiakou
Yinchuan–Lanzhou Zhangjiakou–Hohhot |
| gptkbp:startPoint |
gptkb:Beijing
|
| gptkbp:status |
partially operational
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:Beijing–Zhangjiakou_high-speed_railway
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Beijing–Lanzhou high-speed railway
|