Statements (23)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:road | 
| gptkbp:connects | gptkb:Qazigund gptkb:Banihal | 
| gptkbp:constructionStartYear | 2011 | 
| gptkbp:elevation | 1,790 m | 
| gptkbp:features | gptkb:firefighting_system gptkb:ventilation_system emergency exits CCTV surveillance | 
| gptkbp:length | 8.5 km | 
| gptkbp:locatedIn | gptkb:India gptkb:Jammu_and_Kashmir | 
| gptkbp:numberOfLanes | 2 | 
| gptkbp:opened | 2021 | 
| gptkbp:operator | gptkb:National_Highways_Authority_of_India | 
| gptkbp:partOf | gptkb:NH_44 | 
| gptkbp:passesThrough | gptkb:Pir_Panjal_Range | 
| gptkbp:purpose | all-weather road connectivity | 
| gptkbp:replacedBy | gptkb:Jawahar_Tunnel | 
| gptkbp:toll | yes | 
| gptkbp:bfsParent | gptkb:Jawahar_Tunnel | 
| gptkbp:bfsLayer | 7 | 
| https://www.w3.org/2000/01/rdf-schema#label | Banihal Tunnel |