Asyut Barrage

GPTKB entity

Statements (85)
Predicate Object
gptkbp:instance_of gptkb:river
gptkbp:academic_programs early example of dam engineering
by British engineers
gptkbp:associated_with gptkb:Asyut_Governorate
gptkb:Aswan_High_Dam
gptkbp:benefits local farmers
provides jobs
gptkbp:climate_adaptation aids in
gptkbp:climate_impact mitigates drought effects
mitigates droughts
gptkbp:collaboration promotes among countries.
gptkbp:community_involvement local stakeholders engaged
in maintenance
gptkbp:constructed_in 1902
gptkbp:construction_cost gptkb:significant
gptkbp:construction_material concrete
gptkbp:construction_method concrete
gptkbp:construction_started 1898-1902
gptkbp:controls gptkb:Nile_River
gptkbp:cultivation increased crop yields
gptkbp:cultural_significance part of local heritage
gptkbp:dam_type gravity dam
gptkbp:design by British engineers
gptkbp:electrification limited
gptkbp:emergency_services in place
gptkbp:environmental_impact affects local ecosystems
gptkbp:fishing_regulations available
gptkbp:flood_control provides
reduces
gptkbp:floodgates 6 gates
gptkbp:future_plans upgrades and improvements planned
gptkbp:height 12 meters
gptkbp:historical_event linked to Nile management
witnessed major floods
gptkbp:historical_records documented in Egyptian history
gptkbp:historical_significance high
important for agriculture
critical for Upper Egypt
first barrage on the Nile
https://www.w3.org/2000/01/rdf-schema#label Asyut Barrage
gptkbp:hydropower_capacity not significant
gptkbp:impact flood control
increased agricultural productivity
gptkbp:infrastructure supports agricultural development
irrigation canals
gptkbp:length 340 meters
3,200 meters
gptkbp:local_economy supports agriculture
supports
gptkbp:location Asyut, Egypt
gptkbp:maintenance annual
regular inspections
Egyptian Ministry of Water Resources and Irrigation
gptkbp:navigation_system facilitates
gptkbp:operational_status active
gptkbp:original_purpose water diversion
gptkbp:owner gptkb:Egyptian_government
gptkbp:project Nile Valley development
gptkbp:purpose irrigation
gptkbp:renovation ongoing
underwent several upgrades
gptkbp:research conducted on its impact
gptkbp:reservoir gptkb:Lake_Nasser
gptkbp:safety_measures implemented for flood risks
gptkbp:serves gptkb:Upper_Egypt
agriculture
gptkbp:silt_management important
gptkbp:spillway_type included
gated spillway
gptkbp:tourist_attraction yes
gptkbp:type gptkb:river
gravity dam
gptkbp:water_diversion for irrigation purposes
gptkbp:water_flow_regulation gptkb:Nile_River
gptkbp:water_management 8 meters
critical
controlled
regulated by government
integral part of Nile management system
gptkbp:water_quality monitored
gptkbp:water_requirement regulated
to surrounding areas
to irrigation canals
gptkbp:water_source gptkb:Nile_River
to cities