Statements (19)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:color |
red
|
| gptkbp:country |
gptkb:Turkey
|
| gptkbp:electrification |
750 V DC third rail
|
| gptkbp:endPoint |
gptkb:Batıkent
|
| gptkbp:length |
14.7 km
|
| gptkbp:location |
gptkb:Ankara
|
| gptkbp:numberOfStations |
12
|
| gptkbp:opened |
1997
|
| gptkbp:operator |
gptkb:EGO
|
| gptkbp:partOf |
gptkb:Ankara_Metro
|
| gptkbp:startPoint |
gptkb:Kızılay
|
| gptkbp:status |
operational
|
| gptkbp:system |
gptkb:Ankara_Metro
|
| gptkbp:trackGauge |
1435 mm
|
| gptkbp:type |
rapid transit
|
| gptkbp:bfsParent |
gptkb:Macunköy_Metro_Station
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Ankara Metro M1
|