Ankara–Eskişehir high-speed railway
                        
                            GPTKB entity
                        
                    
                Statements (23)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:train | 
| gptkbp:constructionStartYear | 2003 | 
| gptkbp:country | gptkb:Turkey | 
| gptkbp:electrification | 25 kV AC, 50 Hz overhead line | 
| gptkbp:endPoint | gptkb:Eskişehir | 
| gptkbp:length | 245 km | 
| gptkbp:maximumSpeed | 250 km/h | 
| gptkbp:numberOfTracks | 2 | 
| gptkbp:opened | 13 March 2009 | 
| gptkbp:operator | gptkb:Turkish_State_Railways | 
| gptkbp:owner | gptkb:Turkish_State_Railways | 
| gptkbp:partOf | gptkb:Ankara–Istanbul_high-speed_railway | 
| gptkbp:region | gptkb:Central_Anatolia | 
| gptkbp:serves | gptkb:Sincan gptkb:Bozüyük gptkb:Polatlı | 
| gptkbp:startPoint | gptkb:Ankara | 
| gptkbp:status | operational | 
| gptkbp:trackGauge | 1435 mm | 
| gptkbp:bfsParent | gptkb:Ankara_YHT_railway_station gptkb:HT65000_high-speed_trainsets | 
| gptkbp:bfsLayer | 7 | 
| https://www.w3.org/2000/01/rdf-schema#label | Ankara–Eskişehir high-speed railway |