Androscoggin River Bridge

GPTKB entity

Statements (55)
Predicate Object
gptkbp:instance_of gptkb:bridge
gptkbp:associated_with economic growth
local history
regional development
transportation improvements
gptkbp:city Brunswick
Topsham
gptkbp:connects Brunswick and Topsham
gptkbp:construction_cost $20 million
gptkbp:construction_started gptkb:1998
gptkb:2000
gptkbp:coordinates 43.9142° N, 69.9664° W
gptkbp:crosses gptkb:Androscoggin_River
gptkbp:design gptkb:HNTB_Corporation
cable-stayed bridge
gptkbp:designed_for heavy traffic
extreme weather conditions
gptkbp:environmental_impact minimal
gptkbp:features gptkb:pedestrian_walkway
gptkb:lighting_system
scenic views
bicycle lane
gptkbp:function pedestrian access
vehicle traffic
gptkbp:funding federal and state funds
gptkbp:historical_significance replaced an older bridge
https://www.w3.org/2000/01/rdf-schema#label Androscoggin River Bridge
gptkbp:inspired_by modern bridge designs
gptkbp:length 1,200 feet
gptkbp:location gptkb:Androscoggin_River
gptkbp:maintenance gptkb:Maine_Department_of_Transportation
gptkbp:material gptkb:steel
concrete
gptkbp:notable_for aesthetic appeal
community integration
engineering innovation
sustainability features
gptkbp:open_to_public November 2000
gptkbp:opened gptkb:2000
gptkbp:owner gptkb:Maine_Department_of_Transportation
gptkbp:part_of Maine State Route 24
gptkbp:passenger_traffic approximately 20,000 vehicles per day
gptkbp:renovation planned for 2025
gptkbp:safety_features guardrails
emergency lanes
traffic signals
surveillance cameras
gptkbp:used_for community events
local festivals
marathon events
bicycle races
gptkbp:view gptkb:Androscoggin_River
surrounding parks
gptkbp:bfsParent gptkb:Androscoggin_River
gptkbp:bfsLayer 5