Alp Transit project

GPTKB entity

Statements (48)
Predicate Object
gptkbp:instance_of gptkb:infrastructure
gptkbp:audience positive
controversial during planning
gptkbp:benefits environmental sustainability
reduced travel time
increased capacity
gptkbp:budget approximately 12 billion Swiss francs
gptkbp:challenges geological conditions
water ingress
tunnel ventilation
gptkbp:collaborator local authorities
construction companies
international engineering firms
gptkbp:construction_started gptkb:2007
gptkb:2016
gptkbp:cultural_significance national pride
symbol of Swiss engineering
gptkbp:end_date gptkb:2020
gptkbp:environmental_impact wildlife corridors
mitigation measures
noise reduction strategies
gptkbp:future_plans sustainability initiatives
further rail enhancements
integration with European rail network
https://www.w3.org/2000/01/rdf-schema#label Alp Transit project
gptkbp:impact gptkb:tourism
regional economy
transportation efficiency
gptkbp:initiated_by gptkb:Swiss_government
gptkbp:key_feature gptkb:Ceneri_Base_Tunnel
gptkb:Gotthard_Base_Tunnel
gptkbp:length 57.1 kilometers
gptkbp:location gptkb:Switzerland
gptkbp:main_tunnel gptkb:Gotthard_Base_Tunnel
gptkbp:operator gptkb:Swiss_Federal_Railways
gptkbp:production_status completed
gptkbp:project railway construction
gptkbp:purpose improve rail transport
gptkbp:region gptkb:Alps
gptkbp:safety_features fire safety measures
emergency exits
advanced signaling systems
gptkbp:secondary_tunnel gptkb:Ceneri_Base_Tunnel
gptkbp:significance world's longest railway tunnel
gptkbp:start_date gptkb:1996
gptkbp:wing_configuration 57.1 kilometers
gptkbp:bfsParent gptkb:Landwasser_Viaduct
gptkbp:bfsLayer 6