Statements (19)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:alsoKnownAs |
gptkb:Shanghai_Airport_Link
|
| gptkbp:constructionStartYear |
June 2021
|
| gptkbp:electrification |
25 kV AC
|
| gptkbp:endPoint |
gptkb:Pudong_International_Airport
|
| gptkbp:length |
68.6 km
|
| gptkbp:location |
gptkb:Shanghai
|
| gptkbp:maximumSpeed |
160 km/h
|
| gptkbp:numberOfStations |
9
|
| gptkbp:operator |
gptkb:China_Railway_Shanghai_Group
|
| gptkbp:plannedOpening |
2026
|
| gptkbp:purpose |
connects Hongqiao and Pudong airports
|
| gptkbp:startPoint |
gptkb:Hongqiao_Railway_Station
|
| gptkbp:status |
under construction
|
| gptkbp:system |
gptkb:Shanghai_Suburban_Railway
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:bfsParent |
gptkb:Airport_Line
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Airport Line (Shanghai)
|