2008 Chatsworth train collision
GPTKB entity
Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_line
|
gptkbp:cause |
Metrolink engineer failed to stop at red signal
engineer was texting while operating train |
gptkbp:date |
2008-09-12
|
https://www.w3.org/2000/01/rdf-schema#label |
2008 Chatsworth train collision
|
gptkbp:injuries |
135
|
gptkbp:investigatedBy |
gptkb:National_Transportation_Safety_Board
|
gptkbp:involves |
Metrolink commuter train
Union Pacific freight train |
gptkbp:location |
gptkb:Chatsworth,_Los_Angeles,_California,_United_States
|
gptkbp:operator |
gptkb:Union_Pacific_Railroad
Metrolink |
gptkbp:resultedIn |
gptkb:Rail_Safety_Improvement_Act_of_2008
increased calls for positive train control |
gptkbp:trainNumber |
gptkb:Metrolink_111
gptkb:Union_Pacific_8485 |
gptkbp:victim |
25
|
gptkbp:bfsParent |
gptkb:Metrolink_(Southern_California)
gptkb:Metrolink_(California) |
gptkbp:bfsLayer |
7
|