Triple
T7896601
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISO/IEC 20000 |
E183355
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IT service management standard |
C15925
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IT service management standard Context triple: [ISO/IEC 20000, instanceOf, IT service management standard]
-
A.
ICT standard
chosen
An ICT standard is an agreed set of technical specifications and guidelines that ensure interoperability, compatibility, security, and quality for information and communication technology products and services.
-
B.
information security standard
An information security standard is a formalized set of policies, procedures, and controls designed to protect information assets by defining consistent requirements for confidentiality, integrity, and availability.
-
C.
software standard
A software standard is an agreed-upon set of rules, formats, and practices that ensures compatibility, interoperability, and quality across different software systems and components.
-
D.
ISO framework
A structured, internationally recognized system of standards and guidelines developed by the International Organization for Standardization (ISO) to ensure quality, safety, efficiency, and interoperability across products, services, and processes.
-
E.
security management framework
A security management framework is a structured set of policies, processes, roles, and controls that organizations use to systematically identify, assess, manage, and monitor security risks to their information and assets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca828c474c8190a254d6499871eaff |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:01 p.m.