Triple
T740332
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Labour Code of Practice |
E15229
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | occupational safety and health code of practice |
C4530
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: occupational safety and health code of practice Context triple: [International Labour Code of Practice, instanceOf, occupational safety and health code of practice]
-
A.
health and safety initiative
A health and safety initiative is a coordinated program of policies, practices, and interventions designed to prevent injuries and illnesses, promote well-being, and ensure a safe environment for individuals in a specific setting or community.
-
B.
crane and hoist safety code
A crane and hoist safety code is a set of standardized rules and guidelines that govern the safe design, installation, operation, inspection, and maintenance of cranes and hoisting equipment to prevent accidents and ensure worker safety.
-
C.
professional conduct code
A professional conduct code is a formal set of principles and rules that guide the ethical behavior, responsibilities, and standards of practice for members of a particular profession.
-
D.
labor law
Labor law is the body of rules and principles governing the rights, duties, and relationships between employers, employees, and labor organizations in the workplace.
-
E.
pressure equipment code
A pressure equipment code is a formal set of engineering standards and regulatory requirements that govern the design, fabrication, inspection, testing, and safe operation of pressure-containing equipment such as boilers, pressure vessels, and piping systems.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49358aa308190adbc9b5a0a2adcf9 |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.