Triple

T685842
Position Surface form Disambiguated ID Type / Status
Subject Beijing Daxing International Airport E13280 entity
Predicate hasRailConnection P848 FINISHED
Object Beijing–Xiong’an intercity railway
The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
E86201 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beijing–Xiong’an intercity railway | Statement: [Beijing Daxing International Airport, hasRailConnection, Beijing–Xiong’an intercity railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Beijing–Xiong’an intercity railway
Context triple: [Beijing Daxing International Airport, hasRailConnection, Beijing–Xiong’an intercity railway]
  • A. Beijing–Guangzhou High-Speed Railway
    The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
  • B. Beijing–Guangzhou Railway
    The Beijing–Guangzhou Railway is one of China’s longest and most important north–south trunk rail lines, connecting the capital Beijing with the major southern metropolis of Guangzhou and serving numerous key cities along its route.
  • C. Shanghai–Wuhan–Chengdu High-Speed Railway
    The Shanghai–Wuhan–Chengdu High-Speed Railway is a major east–west high-speed rail corridor in China that links the coastal metropolis of Shanghai with central and western hubs including Wuhan and Chengdu.
  • D. Wuhan–Guangzhou High-Speed Railway
    The Wuhan–Guangzhou High-Speed Railway is a major Chinese high-speed rail corridor linking central and southern China as part of the Beijing–Guangzhou HSR route, significantly reducing travel times between Wuhan and Guangzhou.
  • E. Xijiao Line
    The Xijiao Line is a light rail transit line in Beijing that primarily serves the city’s western suburban areas, including university and technology districts.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Beijing–Xiong’an intercity railway
Triple: [Beijing Daxing International Airport, hasRailConnection, Beijing–Xiong’an intercity railway]
Generated description
The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Beijing–Xiong’an intercity railway
Target entity description: The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
  • A. Beijing–Guangzhou High-Speed Railway
    The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
  • B. Beijing–Guangzhou Railway
    The Beijing–Guangzhou Railway is one of China’s longest and most important north–south trunk rail lines, connecting the capital Beijing with the major southern metropolis of Guangzhou and serving numerous key cities along its route.
  • C. Shanghai–Wuhan–Chengdu High-Speed Railway
    The Shanghai–Wuhan–Chengdu High-Speed Railway is a major east–west high-speed rail corridor in China that links the coastal metropolis of Shanghai with central and western hubs including Wuhan and Chengdu.
  • D. Wuhan–Guangzhou High-Speed Railway
    The Wuhan–Guangzhou High-Speed Railway is a major Chinese high-speed rail corridor linking central and southern China as part of the Beijing–Guangzhou HSR route, significantly reducing travel times between Wuhan and Guangzhou.
  • E. Xijiao Line
    The Xijiao Line is a light rail transit line in Beijing that primarily serves the city’s western suburban areas, including university and technology districts.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4933e0f98819097d22766c49b61b8 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a4a0924dec8190bbbd2bb244f85211 completed March 1, 2026, 8:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69a6374ee9ac819091abef4167e3433e completed March 3, 2026, 1:20 a.m.
NEDg Description generation batch_69a639ae1efc8190ba546164d8279c28 completed March 3, 2026, 1:30 a.m.
NED2 Entity disambiguation (via description) batch_69a63a2eacc0819080a7056cc54a1264 completed March 3, 2026, 1:32 a.m.
Created at: March 1, 2026, 7:36 p.m.