Triple
T4060683
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beijing–Xiong’an intercity railway |
E86201
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object |
Jingxiong intercity railway
The Jingxiong intercity railway is a high-speed rail line connecting Beijing with the planned Xiong’an New Area in Hebei Province, designed to support regional integration and rapid passenger transport.
|
E412502
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jingxiong intercity railway | Statement: [Beijing–Xiong’an intercity railway, alsoKnownAs, Jingxiong intercity railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Jingxiong intercity railway Context triple: [Beijing–Xiong’an intercity railway, alsoKnownAs, Jingxiong intercity railway]
-
A.
Shanghai–Kunming railway
The Shanghai–Kunming railway is a major east–west trunk line in China that connects the coastal metropolis of Shanghai with the southwestern city of Kunming, traversing several key provinces and economic regions.
-
B.
Nanning–Guangzhou High-Speed Railway
The Nanning–Guangzhou High-Speed Railway is a major high-speed rail corridor in southern China connecting Nanning in Guangxi with Guangzhou in Guangdong, significantly reducing travel time between the two regional hubs.
-
C.
Beijing–Guangzhou High-Speed Railway
The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
-
D.
Wuhan–Guangzhou High-Speed Railway
The Wuhan–Guangzhou High-Speed Railway is a major Chinese high-speed rail corridor linking central and southern China as part of the Beijing–Guangzhou HSR route, significantly reducing travel times between Wuhan and Guangzhou.
-
E.
Shanghai–Nanjing intercity railway
The Shanghai–Nanjing intercity railway is a high-speed rail line in eastern China that connects Shanghai with Nanjing, significantly reducing travel time between major cities in the Yangtze River Delta region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Jingxiong intercity railway Triple: [Beijing–Xiong’an intercity railway, alsoKnownAs, Jingxiong intercity railway]
Generated description
The Jingxiong intercity railway is a high-speed rail line connecting Beijing with the planned Xiong’an New Area in Hebei Province, designed to support regional integration and rapid passenger transport.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Jingxiong intercity railway Target entity description: The Jingxiong intercity railway is a high-speed rail line connecting Beijing with the planned Xiong’an New Area in Hebei Province, designed to support regional integration and rapid passenger transport.
-
A.
Shanghai–Kunming railway
The Shanghai–Kunming railway is a major east–west trunk line in China that connects the coastal metropolis of Shanghai with the southwestern city of Kunming, traversing several key provinces and economic regions.
-
B.
Nanning–Guangzhou High-Speed Railway
The Nanning–Guangzhou High-Speed Railway is a major high-speed rail corridor in southern China connecting Nanning in Guangxi with Guangzhou in Guangdong, significantly reducing travel time between the two regional hubs.
-
C.
Beijing–Guangzhou High-Speed Railway
The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
-
D.
Wuhan–Guangzhou High-Speed Railway
The Wuhan–Guangzhou High-Speed Railway is a major Chinese high-speed rail corridor linking central and southern China as part of the Beijing–Guangzhou HSR route, significantly reducing travel times between Wuhan and Guangzhou.
-
E.
Shanghai–Nanjing intercity railway
The Shanghai–Nanjing intercity railway is a high-speed rail line in eastern China that connects Shanghai with Nanjing, significantly reducing travel time between major cities in the Yangtze River Delta region.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed93c69208190a4efac0efe3cd69b |
completed | March 9, 2026, 2:29 p.m. |
| NER | Named-entity recognition | batch_69aefbd32c0c8190bc575974ccf831b3 |
completed | March 9, 2026, 4:56 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b56b52e31c819099f9d354c197cf00 |
completed | March 14, 2026, 2:06 p.m. |
| NEDg | Description generation | batch_69b56c3a4b708190a55027fd3b2b76e0 |
completed | March 14, 2026, 2:10 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b56cc2ae948190a5e13992626dd547 |
completed | March 14, 2026, 2:12 p.m. |
Created at: March 9, 2026, 3:38 p.m.