Triple

T29021919
Position Surface form Disambiguated ID Type / Status
Subject ProActive Chassis Control suspension E737471 entity
Predicate instanceOf P0 FINISHED
Object hydraulically linked suspension system C8155 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydraulically linked suspension system
Context triple: [ProActive Chassis Control suspension, instanceOf, hydraulically linked suspension system]
  • A. automotive suspension system chosen
    An automotive suspension system is the integrated assembly of springs, dampers, linkages, and related components that connects a vehicle’s body to its wheels to control ride comfort, handling, and road shock isolation.
  • B. adaptive suspension system
    An adaptive suspension system is a vehicle suspension technology that continuously adjusts damping and stiffness in real time based on driving conditions, road surface, and driver inputs to optimize comfort, handling, and stability.
  • C. modular load-carrying system
    A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
  • D. automotive all-wheel-drive system
    An automotive all-wheel-drive system is a drivetrain configuration that automatically distributes engine power to all four wheels to enhance traction, stability, and handling across varying road and weather conditions.
  • E. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f077ee19f881909af48f9cab00a2e5 completed April 28, 2026, 9:03 a.m.
Created at: April 28, 2026, 9:49 a.m.