Triple
T24936682
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kelly Johnson's 14 Rules and Practices |
E623330
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering principle set |
C1000
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering principle set Context triple: [Kelly Johnson's 14 Rules and Practices, instanceOf, engineering principle set]
-
A.
principle
chosen
A principle is a fundamental rule or guiding truth that shapes decisions, behavior, or understanding within a particular domain.
-
B.
set of draft principles
A set of draft principles is a provisional collection of guiding rules or standards formulated for review, discussion, and potential refinement before final adoption.
-
C.
engineering treatise
An engineering treatise is a comprehensive, systematically organized written work that rigorously analyzes, explains, and documents engineering principles, methods, designs, or systems.
-
D.
engineering standard
An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
-
E.
engineering process
An engineering process is a structured, iterative sequence of activities and decisions used to design, develop, test, and maintain systems or products to meet specified requirements efficiently and reliably.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fac6b5a48190a1c38857f00915a9 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:30 a.m.