Triple

T24271012
Position Surface form Disambiguated ID Type / Status
Subject Composition X E605275 entity
Predicate instanceOf P0 FINISHED
Object non-objective art C477 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: non-objective art
Context triple: [Composition X, instanceOf, non-objective art]
  • A. visual arts
    Visual arts encompass creative expressions that primarily engage the sense of sight, such as painting, sculpture, photography, and digital media, to communicate ideas, emotions, and experiences.
  • B. conceptual art piece
    A conceptual art piece is an artwork in which the primary focus is on the idea or concept being expressed, rather than on traditional aesthetic, material, or technical concerns.
  • C. neo-concrete artwork
    A neo-concrete artwork is an abstract, often geometric piece that emphasizes sensory experience, viewer participation, and organic expression over strict rationalism and rigid formalism.
  • D. work of art chosen
    A work of art is a deliberately created object, performance, or experience intended to express ideas or emotions and to be perceived and interpreted aesthetically.
  • E. public art movement
    A public art movement is a collective, often community-driven effort to create and promote artworks in shared public spaces, aiming to engage broad audiences, reflect social values, and transform the experience of the built environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2954707dc8190915551eb114cfff6 completed April 17, 2026, 8:17 p.m.
Created at: April 18, 2026, 12:07 a.m.