Zungeru Hydroelectric Power Station
                        
                            GPTKB entity
                        
                    
                Statements (22)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:hydroelectric_power_station | 
| gptkbp:capacity | 700 MW | 
| gptkbp:commissioned | 2023 | 
| gptkbp:constructionStartYear | 2013 | 
| gptkbp:country | gptkb:Nigeria | 
| gptkbp:fundedBy | gptkb:Export-Import_Bank_of_China | 
| gptkbp:hasTower | 4 | 
| gptkbp:location | gptkb:Niger_State | 
| gptkbp:mainContractor | gptkb:Sinohydro China National Electric Engineering Company | 
| gptkbp:owner | gptkb:Federal_Government_of_Nigeria | 
| gptkbp:purpose | flood control irrigation power generation | 
| gptkbp:river | gptkb:Kaduna_River | 
| gptkbp:status | operational | 
| gptkbp:turbineType | gptkb:Francis | 
| gptkbp:type | gptkb:reservoir | 
| gptkbp:bfsParent | gptkb:Zungeru,_Nigeria gptkb:Zungeru | 
| gptkbp:bfsLayer | 7 | 
| https://www.w3.org/2000/01/rdf-schema#label | Zungeru Hydroelectric Power Station |