Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:reservoir
|
| gptkbp:capacity |
1,800 MW
12.65 billion cubic meters |
| gptkbp:catchmentArea |
694,000 square kilometers
|
| gptkbp:constructionStartYear |
1994
|
| gptkbp:country |
gptkb:China
|
| gptkbp:crosses |
gptkb:Yellow_River
|
| gptkbp:dam |
embankment dam
|
| gptkbp:height |
154 meters
|
| gptkbp:length |
1,317 meters
|
| gptkbp:locatedIn |
gptkb:Henan
gptkb:Jiyuan |
| gptkbp:location |
gptkb:Yellow_River
|
| gptkbp:notableEvent |
major sediment flushing operations
|
| gptkbp:opened |
2001
|
| gptkbp:operator |
gptkb:Yellow_River_Conservancy_Commission
|
| gptkbp:purpose |
flood control
irrigation hydroelectric power generation sediment control |
| gptkbp:status |
operational
|
| gptkbp:surface |
238 square kilometers
|
| gptkbp:website |
http://www.ylj.gov.cn/
|
| gptkbp:bfsParent |
gptkb:Xiaolangdi_Dam
gptkb:Yellow_River_Basin |
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Xiaolangdi Reservoir
|